  5. Atoll Phase 1, Egypt

wnba比分直播新浪爱彩:Atoll Phase 1, Egypt

nba比分188 www.y2w8y.com.cn Completed: 2 December 2017

~45 mboed peak annual average production, net to BP
Atoll Phase 1, Egypt
“BP is focused on delivering growth with discipline, carefully choosing and efficiently executing high-quality projects. The longstanding partnerships we have in Egypt allowed us to fast-track Atoll’s development and deliver first gas only 33 months after discovery. This is a further demonstration of our commitment to help realise Egypt’s oil and gas potential and meet the increasing demand from its growing population.”
?

Bob Dudley, BP group chief executive

BP announced the Atoll discovery in March 2015. The main reservoir in the field contains an estimated 1.5 trillion cubic feet of gas and 31 million barrels of condensates, and further segments are under evaluation.

The Atoll Phase 1 project is an early production scheme involving the recompletion of an existing exploration well as a producing well, the drilling of two additional wells, the installation of the necessary subsea infrastructure, and upgrading of existing onshore facilities required to produce from the field.

The Atoll project was delivered 33 months after discovery, with test production starting on 2 December 2017, seven months ahead of the original plan. The project will produce up to 350 million standard cubic feet a day (mmscfd) gas and 10,000 barrels per day (bpd) condensate, which will be processed at the West Harbour facilities and fed into Egypt's national grid.

Location  Egypt
Operator Pharaonic Petroleum Company (PhPC)
Partners BP (100%)
Project type Conventional gas
Peak annual average production
~65 mboed(gross)
~45 mboed (net)
Atoll Phase 1, Egypt

Atoll’s exploration well reached 6400 metres in depth in 2015. That’s drilling further than the height of Mount Kilimanjaro (5,895 metres).

Atoll Phase 1, Egypt

Atoll’s wells on the seabed connect to new and existing production facilities. That subsea tieback is BP’s longest on record at 110 kilometres, almost as far as the distance between the Egyptian cities of Cairo and Suez.

Atoll Phase 1, Egypt

The Atoll project was delivered 33 months from discovery and seven months ahead of original plan.

Gallery

Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
  • 牙膏的10个超实用功能 速收藏 2019-06-25
  • 黄帝是中华民族最具智慧的人 2019-06-24
  • 宁波上周理财收益率有升有降 6月末回暖仍然可期 2019-06-24
  • 5月经济数据持续稳中向好 下半年转轨高质量发展 2019-06-23
  • 荆楚网(湖北日报网)采购信息 2019-06-22
  • 基层传真--安徽频道--人民网 2019-06-22
  • 中共山西省委组织部公示 2019-06-21
  • 什么是幸福 ——“幸福死了”与“健康长寿” 2019-06-20
  • 证监会查获一起跨境操纵股市案 涉案金额近33亿元 2019-06-19
  • 蠢货!咱是让你们看看制订一个企业发展计划要达到哪些要求,难度有多大?一个具体的企业都这么难,大到一个县,一个省,甚至是一个国家,难度可想而知! 2019-06-19
  • 端午小长假 我省北中部有雨 2019-06-18
  • 悦读 —频道 春城壹网 七彩云南 一网天下 2019-06-18
  • 为藏药材可持续发展垦出“良田沃土” 2019-06-17
  • 端午假期要来了!收藏这份指南,避开人山人海 2019-06-16
  • 【北京中汽南方车型报价】北京中汽南方4S店车型价格 2019-06-15
  • 免费马会一码中特 3d杀号定胆彩经网 辽宁彩票12选5分析软件 北京单场吧 河北11选5网上投注 贵州快3下载 9肖30码图2019 福建31选7附加玩法奖金计算 辽宁11选5助手电脑版下载 黑龙江快乐十分钟开奖 助赢辽宁11选5软件 快乐时时彩官网下载手机版下载手机版 世界杯彩票混合过关 新疆18选7走势图2元网 福利彩26选5好彩3