1. Home
  2. Investors
  3. Upstream major projects
  4. 2019 Upstream major projects
  5. West Nile Delta - Raven, Egypt

虎扑nba比分直播:West Nile Delta - Raven, Egypt

nba比分188 www.y2w8y.com.cn Status: on track

~130 mboed peak annual average production, net to BP
West Nile Delta - Raven, Egypt

Raven is the third stage of the West Nile Delta development (following Taurus / Libra and Giza / Fayoum) to develop 5 trillion cubic feet of gas resources and 55 million barrels of condensates from two BP-operated offshore concession blocks, North Alexandria and West Mediterranean Deepwater. The Raven project includes 8 wells and will be developed as a deepwater long distance tie back to shore, where the new Raven onshore plant is being built, immediately adjacent to the Giza / Fayoum facilities.

Location Egypt
Operator BP
Partners BP (82.75%), DEA Deutsche Erdoel AG (17.25%)
Project type Conventional gas
Peak annual average production
~160 mboed (gross)
~130 mboed (net)
  • 图解:连夺性命隐患大,你还敢让小孩玩喷泉吗? 2019-03-20
  • 5G标准出炉!与4G有啥不一样? 或1秒内下载1G电影 2019-03-20
  • 文房清供:皇帝笔架上的那些奇珍异巧 2019-03-19
  • 天津与中核集团签署战略合作框架协议 2019-03-18
  • 时刻感受它的陪伴 体验长安睿骋CC 2019-03-17
  • 文化和旅游部严查严管营业性演出市场 2019-03-16
  • 江西颁发首张基层群众性自治组织特别法人统一社会信用代码证 2019-03-15
  • 新疆奇台县--旅游频道 2019-03-15
  • 袁隆平:即使海水稻已经成功,我的压力依然很大袁隆平压力 2019-03-14
  • 习近平为全球携手消除贫困提4大倡议 2019-03-13
  • 人民日报各抒己见:环保执法要“严”也要“准” 2019-03-12
  • [鄙视]一边玩去,咱连羞辱你的兴趣都没有了! 2019-03-12
  • 林松添大使陪同浙江省经贸团出席中国(浙江)—南非(东开普)商务论坛 2019-03-11
  • 视频--浙江频道--人民网 2019-03-10
  • 美丽中国:环保督察 不达目的不松手 2019-03-10
  • 111| 763| 394| 242| 722| 460| 206| 600| 769| 868|